EcoRenovator  

Go Back   EcoRenovator > Improvements > Renovations & New Construction
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-13-13, 02:55 PM   #11
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default



I'm still working on a bit of the drywall, I think I have the final layer up on the corner. The main issue there is that I'm transitioning from plaster to drywall and there is a ~1/8" step to take care of. Having never done drywall before, this is a slow learning experience for me. Dusty, but not as horrible as some have made it seem.

I have already primed the ceiling and the majority of the outside wall with the windows. I'm getting awfully close to being able to start working on the hydronic floor (finally something interesting IMO haha).

Attached Thumbnails
Click image for larger version

Name:	IMG_20131109_202409.jpg
Views:	1032
Size:	53.8 KB
ID:	3631  
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by Daox; 11-13-13 at 03:04 PM..
Daox is offline   Reply With Quote
 


Tags
bamboo, diy, flooring, hydronic, remodel, superinsulate


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:04 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design