12-29-13, 12:44 AM | #181 | |
Supreme EcoRenovator
Join Date: Mar 2009
Location: Portland, OR
Posts: 4,004
Thanks: 303
Thanked 723 Times in 534 Posts
|
Quote:
But seriously, were there any issues that you encountered with the plates or PEX? Are you still considering some kind of pour-in heat conductive material for the curved parts? The reason I suggested mortar is that it has a high sand content, and I think that would give it reasonable conductivity... and it's thrifty. Good work. -AC
__________________
I'm not an HVAC technician. In fact, I'm barely even a hacker... |
|
12-30-13, 08:28 AM | #182 |
Administrator
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
|
Haha, thats pretty funny. I wish I could think the rest of this project done.
The only problem I've encountered so far is the lack of necessary tools to staple down the aluminum heat spreaders. I tried a hammer/swing stapler and it just didn't work out well. Then I tried a hand stapler, not enough power. I will probably try a electric stapler tonight, but I don't think that'll cut the mustard either. http://ecorenovator.org/forum/tools/...spreaders.html So, I am going to try a pneumatic stapler. That being said, I haven't actually put down the heat spreaders yet or the tubing. The pictures you see are just test fits. When I cut the plywood strips, I did leave a generous gap between them for the heat spreaders. Still, there will definitely be some cutting involved here and there, at the very least to get the correct lengths. For the curved parts, I am going to see how much of a pain it is to cut the aluminum pieces. However, I probably will end up putting something in there. Who knows, maybe I'll do a combination? I'd really rather not loose any heat conducting area. With the 3 parallel PEX lines, that area is not insignificant.
__________________
Current project - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. & To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
12-30-13, 08:37 AM | #183 |
Administrator
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
|
One more thing I've been thinking about is how to make all 3 parallel tubing runs the same length? If they're unequal, the flow will be unequal. According to my CAD layout, each line is about 143 feet. So, if I'm off a foot or two, is that going to unbalance the flow that much? I'm thinking no, but would appreciate any feedback.
__________________
Current project - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. & To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
12-30-13, 08:42 AM | #184 |
Journeyman EcoRenovator
Join Date: Feb 2010
Location: Arab, AL
Posts: 491
Thanks: 109
Thanked 49 Times in 43 Posts
|
I don't think you would be able to discern the difference. IMHO, each of the three runs of the same size Pex should have the same heat carrying capacity per foot, so any difference a foot or two +/- makes is a non-issue.
Last edited by gasstingy; 12-30-13 at 08:43 AM.. Reason: left a word out |
The Following User Says Thank You to gasstingy For This Useful Post: | Daox (12-30-13) |
12-30-13, 01:14 PM | #185 | |
Supreme EcoRenovator
Join Date: Mar 2009
Location: Portland, OR
Posts: 4,004
Thanks: 303
Thanked 723 Times in 534 Posts
|
Quote:
So, if you are different by 2 feet, the change will be 100 x (2/143) = 1.4% That's a very small variation. Therefore, not to worry. -AC
__________________
I'm not an HVAC technician. In fact, I'm barely even a hacker... |
|
The Following User Says Thank You to AC_Hacker For This Useful Post: | Daox (12-30-13) |
02-08-14, 03:04 PM | #186 |
Administrator
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
|
What has been holding up the floor progress is what you see below. Yay, its done!
__________________
Current project - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. & To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
02-08-14, 03:11 PM | #187 |
Apprentice EcoRenovator
Join Date: Aug 2012
Location: California
Posts: 274
Thanks: 19
Thanked 37 Times in 28 Posts
|
Very impressive! Congratulations on the good work you've done. The end looks like its in sight, at least in the office. Other things always seem to come up, I know.
|
02-10-14, 08:06 AM | #188 |
Journeyman EcoRenovator
Join Date: Feb 2010
Location: Arab, AL
Posts: 491
Thanks: 109
Thanked 49 Times in 43 Posts
|
Looks good! I know you're proud to be that much closer to finishing this room so you can move on to other projects!
|
02-14-14, 09:43 PM | #189 |
Administrator
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
|
The bulk of the next step I got done tonight. All of the full size aluminum heat spreaders have been stapled down. It was a pretty quick job. With just me doing it, it only took an hour. I estimate another hour to cut a bunch of the heat spreaders to fill in as much as I can. After that I will play around with AC's idea about using mortar to fill in the remaining area. As you can see, the areas where the heat spreader can't reach is quite a bit with the 3 parallel pex lines being run.
For those looking for specifics, I use a pneumatic stapler. No other stapler I tried worked. I did have to run my pressure around 55 psi to prevent from blowing through the aluminum. It went very smoothly after I got the pressure set. I only had to hammer in about 3 staples. I left only about 1/8" between the heat spreaders length wise. When I laid the heat spreaders in the groove, I shifted them to one side (consistently for the whole room), and stapled that side. This helped give room to play since my plates were so close together. Only in a couple spots did my plates get really close, so there should be room for them to expand when they heat up. With the grooves cut extra wide, there was enough play to align things when needed. I did use a small length of pex tubing to test the fit after putting in some of the heat spreaders. But, the aluminum plates aren't so thick that they won't give to allow for some misalignment when the tube exits one spreader and enters the next. Just starting out: All done (for now): Here is what the bend area looks like. There will be some plates cut to length and fit in there. However, I'll have to figure out something for the radiused areas. There is too much surface area to loose there to not do anything.
__________________
Current project - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. & To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
02-15-14, 11:39 AM | #190 | |
Apprentice EcoRenovator
Join Date: Feb 2010
Location: Milford, DE
Posts: 106
Thanks: 5
Thanked 9 Times in 9 Posts
|
Quote:
|
|