02-04-20, 01:07 AM | #1 |
Apprentice EcoRenovator
Join Date: May 2011
Location: Tortosa, Spain
Posts: 221
Thanks: 2
Thanked 81 Times in 46 Posts
|
All year greenhouse V2.0
After the V1.0 disaster here we go again..
I was given a polytunnel a couple of years ago, brand new unused. I'm going to try with this for now however a local glazing company have just offered me some windows that were left over from some previous jobs so in the not too distant future I'll do a serious upgrade to a fixed structure that will hopefully not be prone to wind damage. Anyway, for now it's the poly tunnel plus some extra ropes and concrete blocks to hopefully hold it down. The controller stuff.. Since the last greenhouse controller I made a radical shift away from PIC processors to Arduino and then ESP8266 which has built in WiFi. So a completely re-designed and re-written controller was in order. I've used a couple of environmental sensors for light monitoring and temperature/humidity (and for interest atmospheric pressure) with everything now displayed on a web browser in my office. From here I can monitor and control the heating and lighting. Later I'll add watering and temperature control but not until the fixed structure is built. The poly tunnel. The green covering is to both add extra strength and for shading. The plant stands are simply concrete blocks and old pallets. The environment sensors. The main status display |
02-05-20, 08:12 AM | #2 |
Administrator
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
|
Very impressive as usual Actuario! The wifi stuff is so cool. I haven't gotten into any of that yet myself.
What are you all growing in the greenhouse?
__________________
Current project - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. & To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
02-05-20, 11:38 AM | #3 |
Super Moderator
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
|
I love the Wi-Fi controls and the monitoring app.
Your Lettuce is looks good.
__________________
Current project Aquaponics system , Passive Solar Greenhouse build To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Solar Install 12.5 Kwh- To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Mini Split installs - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. EV Chevy Volt - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
02-05-20, 11:46 PM | #4 | |
Apprentice EcoRenovator
Join Date: May 2011
Location: Tortosa, Spain
Posts: 221
Thanks: 2
Thanked 81 Times in 46 Posts
|
Quote:
In the greenhouse at the moment I have sweet peppers, tomatoes, lettuce, runner beans, chilli peppers, rhubarb, onions and cucumbers. I'm hoping to grow lettuce all year and time will tell what else. At the back on the left you can see the grow lights I'm using. |
|
The Following User Says Thank You to Acuario For This Useful Post: | Daox (02-06-20) |
02-05-20, 11:57 PM | #5 |
Apprentice EcoRenovator
Join Date: May 2011
Location: Tortosa, Spain
Posts: 221
Thanks: 2
Thanked 81 Times in 46 Posts
|
Here is a screenshot of the performance during 24 hours, it lets me monitor both the solar batteries and temperature variations in the greenhouse.
It's amazing that in February, typically the coldest month of the year here, the temperature is getting up to 34C. |
02-29-20, 12:52 AM | #6 |
Apprentice EcoRenovator
Join Date: May 2011
Location: Tortosa, Spain
Posts: 221
Thanks: 2
Thanked 81 Times in 46 Posts
|
Here's an update on the greenhouse and future plans..
So far no very strong winds so the poly tunnel is still standing although it is starting to deteriorate. Everything inside is growing like crazy, we have runner beans climbing string guides, loads of tomato plants, lettuce, rhubarb, peppers, cucumbers, pumpkins all coming along nicely and it's only the end of February. Anyway, at some moment we will get strong winds - that's guaranteed so phase 2 is in progress. I've just spent the last 2 days with my builders hat on building the main back wall. Today I'll start the front wall. The orientation is pretty close on south facing so my plan is to have a glass (or equivalent) roof, glass sliding door and 3 big glass windows in the south facing wall. The north wall won't have any windows and will provide shade behind it for the rhubarb. Fortunately a double glazing company that I work with have just moved workshops and have loads of doors/windows left over from various jobs that I can get extremely cheaply. I've chosen sliding windows for all of them so I can hopefully automate opening/closing for ventilation. The plans for heating/cooling I have at the moment are:
I'll update as things progress. Acuario |
02-29-20, 11:26 PM | #7 |
Apprentice EcoRenovator
Join Date: May 2011
Location: Tortosa, Spain
Posts: 221
Thanks: 2
Thanked 81 Times in 46 Posts
|
Here is a photo of the plants on 29th February in the existing polytunnel
..and the new greenhouse taking shape.. East facing wall and entrance door North wall South facing |
The Following User Says Thank You to Acuario For This Useful Post: | skyking (03-14-20) |
03-04-20, 09:33 AM | #8 |
Helper EcoRenovator
Join Date: Dec 2019
Location: Northern Utah
Posts: 49
Thanks: 1
Thanked 2 Times in 2 Posts
|
If you end up using some glass panels in the future, make sure they are tempered for safety.
Also consider glazing angle for winter time sun angle. Glass can reflect allot at certain angles unlike plastic that doesn't care. |
03-11-20, 11:27 PM | #9 |
Apprentice EcoRenovator
Join Date: May 2011
Location: Tortosa, Spain
Posts: 221
Thanks: 2
Thanked 81 Times in 46 Posts
|
Here is the (almost) finished greenhouse.
I still need to add some of the automation but it is now operational. The roof is 10mm polycarbonate panel. The picture shows the blinds down, the two windows have double glazed glass panels behind. The orange colored panel is temporary while I wait for the glass to arrive. |
The Following User Says Thank You to Acuario For This Useful Post: | skyking (03-14-20) |
03-14-20, 10:51 AM | #10 |
Helper EcoRenovator
Join Date: May 2011
Location: Western Washington
Posts: 91
Thanks: 47
Thanked 20 Times in 13 Posts
|
Looking really great!!
My green thumb is not so good, but I applaud your efforts. Bravo! |
|
|