My old Fluke meter has that function (conductance, mhos). Some 30+ years ago, I bought a Fluke and was appalled at the "high" price. Worth every penny. The only thing that has needed replacements are a few 9V batteries and a fuse. One rugged work horse.

Oh - and a set of leads when I mistook current for voltage and burned them up. Meter was fine. Had to replace the fuse inside.


Steve

__________________
consulting on geothermal heating/cooling & rational energy use since 1990
stevehull is offline   Reply With Quote
The Following User Says Thank You to stevehull For This Useful Post:
jeff5may (09-14-16)
Old 09-14-16, 10:58 AM   #12
CrankyDoug
Apprentice EcoRenovator
 
Join Date: Jul 2016
Location: Georgia
Posts: 100
Thanks: 6
Thanked 14 Times in 11 Posts
Default

Quote:
Originally Posted by stevehull View Post
Doug,

I strongly suggest checking your grounding system.
Steve;

Incorrect grounding methods were part of the problem, although in our case the phone line was the major culprit. We haven't lost anything major since I pulled down the phone line.

On the advice of our co-op field engineer I removed two ground rods that were daisy-chained out to the HVAC units. I then added a second rod at the transformer. He said some residential installations near the lake have four to six rods at the pole where the transformer is mounted. Only one rod should be installed at the service entrance and that one is for safety (per code), not lightening surge.

I recently noticed that all new Okuma machining centers now have their own transformer mounted on the cabinet. Each machine has its own ground rod but it is tied directly to the transformer. I guess Okuma got tired of replacing PLC's and servos here in the lightening belt.

I've always wanted a mho meter. Probably should have purchased one before I retired. I do check the ground rod clamps about once a year.

Doug
CrankyDoug is offline   Reply With Quote
Old 09-14-16, 12:24 PM   #13
stevehull
Steve Hull
 
Join Date: Dec 2012
Location: hilly, tree covered Arcadia, OK USA
Posts: 826
Thanks: 241
Thanked 165 Times in 123 Posts
Default

A lot of well intentioned and sometimes poorly trained engineers put additional ground rods throughout an installation. These create ground loops.

Best practice is to put a set of superb grounds at the service entrance. That minimizes ground loops.

Steve

__________________
consulting on geothermal heating/cooling & rational energy use since 1990
stevehull is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 09:39 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design