EcoRenovator  

Go Back   EcoRenovator > Improvements > EcoRenovator Blog Discussion
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 09-10-13, 10:20 AM   #1
ER Blogger
Helper EcoRenovator
 
Join Date: Nov 2010
Location: Internet
Posts: 60
Thanks: 0
Thanked 2 Times in 2 Posts
Default Downsizing a Long Plumbing Run For Faster Hot Water

While I am remodeling my office, I decided to take the opportunity to access some plumbing in the wall and ceiling. I have a bathroom on my second floor, and it takes a long time to get hot water up there since the hot water heater is in the basement. The old setup was run […]

More...

ER Blogger is offline   Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:24 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design