EcoRenovator  

Go Back   EcoRenovator > Improvements > Solar Heating
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-10-15, 01:13 PM   #1
osolemio
Hong Kong
 
Join Date: May 2010
Location: Hong Kong
Posts: 108
Thanks: 20
Thanked 17 Times in 13 Posts
Default Partly operational: Extensive solar thermal/electric hybrid system

My very extensive solar power project that I have been working on for about 5 years (on and off, as time and money permits), is now partly operational.

Temperatures here are in Centigrade:



As you can see, the annual geo solar heat storage, as well as the 3 x 375 USG buffer tanks are NOT yet online (gray lines). Even so, massive amounts of heat is captured and sent into the foundation of the house, as well as into the 375 USG main heat buffer.

I hope to have the system fully operational by this summer.

__________________
Space heating/cooling and water heating by solar, Annual Geo Solar, drainwater heat recovery, Solar PV (to grid), rainwater recovery and more ...
Installing all this in a house from 1980, Copenhagen, Denmark. Living in Hong Kong. Main goal: Developing "Diffuse Light Concentration" technology for solar thermal.
osolemio is offline   Reply With Quote
The Following 4 Users Say Thank You to osolemio For This Useful Post:
ctgottapee (04-20-15), Daox (03-12-15), Piwoslaw (03-11-15), where2 (03-10-15)
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 09:44 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design