EcoRenovator  

Go Back   EcoRenovator > Improvements > Energy Storage
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts Search Today's Posts Mark Forums Read


Reply
 
Thread Tools Display Modes
Old 12-12-14, 12:55 AM   #41
AC_Hacker
Supreme EcoRenovator
 
AC_Hacker's Avatar
 
Join Date: Mar 2009
Location: Portland, OR
Posts: 4,004
Thanks: 303
Thanked 723 Times in 534 Posts
Default

Quote:
Originally Posted by Mikesolar View Post
5 panels in parallel will have inconsistent flow charactistics no mater how well it is piped and it must be piped in a reverse return fashion.
Would your argument against parallel piping in solar collectors apply equally to parallel piping in hydronic heating?

-AC

__________________
I'm not an HVAC technician. In fact, I'm barely even a hacker...
AC_Hacker is offline   Reply With Quote
Old 12-12-14, 06:30 AM   #42
Mikesolar
Master EcoRenovator
 
Mikesolar's Avatar
 
Join Date: Aug 2012
Location: Toronto
Posts: 958
Thanks: 40
Thanked 158 Times in 150 Posts
Default

Consider the flow rate needed to be between 0.5 and 1L/min/m2 of collector (aperture area, not gross area) being on the higher side for series installs. With 22mm piping and not too long a run, the head loss should not be too much. The issue is guaranteed flow through all tubes or the header and enough positive pressure. Also, make sure you have at least 0.5 bar at the top of the panel (when cold) or winter time flow may be an issue.
Mikesolar is offline   Reply With Quote
The Following User Says Thank You to Mikesolar For This Useful Post:
buffalobillpatrick (01-07-15)
Old 12-12-14, 06:39 AM   #43
Mikesolar
Master EcoRenovator
 
Mikesolar's Avatar
 
Join Date: Aug 2012
Location: Toronto
Posts: 958
Thanks: 40
Thanked 158 Times in 150 Posts
Default

Quote:
Originally Posted by AC_Hacker View Post
Would your argument against parallel piping in solar collectors apply equally to parallel piping in hydronic heating?

-AC
Nope. Funny things happen with solar that are way more controllable in hydronic heating. Balancing is much easier when every loop is on one floor or there is a balancing valve on each loop. This isn't the case with solar where you often have 2 phase (liquid and steam) operation and the minor differences in piping can force fluid through one panel and not another. Placement of balancing valves on the roof is important as well. They should be on the output side of the bank of collectors so that there is always a positive pressure on the header. That creates an issue of the effect of steam or very hot temps on valves and their longevity.

All this, and more, is why I have gone back to flat panels. Tubes are efficient, but much more finicky.
Mikesolar is offline   Reply With Quote
The Following User Says Thank You to Mikesolar For This Useful Post:
buffalobillpatrick (01-07-15)
Old 02-22-15, 03:41 PM   #44
sunspot
Apprentice EcoRenovator
 
Join Date: Apr 2012
Location: Vancouver Island, BC
Posts: 146
Thanks: 30
Thanked 35 Times in 29 Posts
Default

Trying to maintain some momentum, motivation, and progress on this so I got a start on the fiberglass liner.

I'm using a 1/2 oz veil and two layers of 1 1/2 oz mat in vinyl ester resin. First step, cut the material



Then I put two sheets of melamine on the shop floor and taped the joint with aluminum tape. Unrolled a layer of veil and one layer of mat on the temporary casting table.



Wet it out with resin. Air roll. Add the second layer of mat and air roll again.



Let cure, trim to size, and scuff the edges for the corner tape.



The finished layup is just under 2 1/2 mm thick on average.



And a translucent green.



The sheets in the tank waiting for the corners to get taped. This might not happen for a while. I'll need good weather so I can open the doors and vent the foul odour of the resin until cured.


Last edited by sunspot; 02-22-15 at 04:28 PM..
sunspot is offline   Reply With Quote
The Following User Says Thank You to sunspot For This Useful Post:
Daox (02-23-15)
Old 02-22-15, 03:43 PM   #45
Mikesolar
Master EcoRenovator
 
Mikesolar's Avatar
 
Join Date: Aug 2012
Location: Toronto
Posts: 958
Thanks: 40
Thanked 158 Times in 150 Posts
Default

Very nice work. Keep it coming.
Mikesolar is offline   Reply With Quote
Old 02-22-15, 08:00 PM   #46
sunspot
Apprentice EcoRenovator
 
Join Date: Apr 2012
Location: Vancouver Island, BC
Posts: 146
Thanks: 30
Thanked 35 Times in 29 Posts
Default

Quote:
Originally Posted by Mikesolar View Post
Very nice work.
Thanks Mike.
sunspot is offline   Reply With Quote
Old 02-22-15, 10:03 PM   #47
Ron342
Apprentice EcoRenovator
 
Join Date: Feb 2010
Location: Maryland
Posts: 120
Thanks: 26
Thanked 12 Times in 8 Posts
Default Pond liners anyone?

Nice glass work guy!
I notice that lots of folks take the easy route & use pond liners in a big sheet in their storage tanks and let the water pressure force it into the corners.
But I wonder if it can stand the temps you're looking at??
Ron342 is offline   Reply With Quote
Old 02-23-15, 08:29 AM   #48
sunspot
Apprentice EcoRenovator
 
Join Date: Apr 2012
Location: Vancouver Island, BC
Posts: 146
Thanks: 30
Thanked 35 Times in 29 Posts
Default

Quote:
Originally Posted by Ron342 View Post
Nice glass work guy!
I notice that lots of folks take the easy route & use pond liners in a big sheet in their storage tanks and let the water pressure force it into the corners.
But I wonder if it can stand the temps you're looking at??
Thanks Ron. The thought of wrestling half an acre of pond liner into a deep box held no appeal for me (easy route? I think not!). And how to tidy up the top edge? Visions of empty caulking tubes and staples would have kept me up nights. But as you say lots of folks do it. The track record is there and I think it's a good option for those so inclined. As for temperature I know nothing of pond liner but I chose the V.E. resin for it's elevated service temperature tolerance so I'm hoping it's ok.
sunspot is offline   Reply With Quote
Old 02-23-15, 09:17 AM   #49
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

Looks great! I too would be interested to know exactly how high of temps that fiberglass can take.
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote
Old 02-23-15, 09:42 AM   #50
sunspot
Apprentice EcoRenovator
 
Join Date: Apr 2012
Location: Vancouver Island, BC
Posts: 146
Thanks: 30
Thanked 35 Times in 29 Posts
Default

Quote:
Originally Posted by Daox View Post
Looks great! I too would be interested to know exactly how high of temps that fiberglass can take.
According to the resin manufacturer the heat distortion temperature is 239°F.

sunspot is offline   Reply With Quote
The Following User Says Thank You to sunspot For This Useful Post:
Daox (03-19-15)
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:09 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design