03-11-16, 09:26 AM | #11 |
Super Moderator
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
|
I had a chance to work on my stands some more. I am welding the last stand for this row.
I need to build a bracket/stand to go around the post. When I cut down the pallet racking and when I put it back together I needed to make it a little wider to fit the 55 gallon barrels between the rails. This put my DWC stand hitting the main beam. Time to start welding to fix it.
__________________
Current project Aquaponics system , Passive Solar Greenhouse build To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Solar Install 12.5 Kwh- To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Mini Split installs - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. EV Chevy Volt - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Last edited by pinballlooking; 03-12-16 at 06:49 AM.. |
|
|