EcoRenovator  

Go Back   EcoRenovator > Improvements > Solar Power
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-14-14, 10:04 AM   #12
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

The microinverters talk across the neutral wire. The inspector will want the wires in the same gauge in conduit (as stated above)
Check out these two projects.

My utility company requires a disconnect switch right by the meter so check with yours and see if they require that. if so adjust your wiring plan.


Designing and Installing a Grid-Tie PV System Designing and Installing a Grid-Tie PV System
http://www.builditsolar.com/Projects...asePV/Main.htm

Doug's New 4.6 KW micro inverter DIY Grid Tied PV Array
http://www.builditsolar.com/Projects...ougEnphase.htm

Here is my 12.5 kw self-install.
http://ecorenovator.org/forum/solar-...lar-array.html

Last edited by pinballlooking; 01-14-14 at 10:10 AM..
pinballlooking is offline   Reply With Quote
The Following User Says Thank You to pinballlooking For This Useful Post:
Exeric (01-14-14)
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:12 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design