EcoRenovator  

Go Back   EcoRenovator > Improvements > Geothermal & Heat Pumps
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-21-12, 10:24 PM   #10
AC_Hacker
Supreme EcoRenovator
 
AC_Hacker's Avatar
 
Join Date: Mar 2009
Location: Portland, OR
Posts: 4,004
Thanks: 303
Thanked 723 Times in 534 Posts
Default

Quote:
Originally Posted by Vlad View Post
My drilling was finished about 1.5 month ago but weather was holding me back. Last week I rented excavator to dig trenches. So now all my vertical loops connected together, pressure tested and I started burying process. Few more days and my ground loop will be done
Great work, Vlad.

It really is a lot of work... and when you're done and the earth is moved back into place, and nature starts smoothing things out, it's like nothing ever happened.

Kind of strange & satisfying at the same time...

-AC
__________________
I'm not an HVAC technician. In fact, I'm barely even a hacker...
AC_Hacker is offline   Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:57 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design