EcoRenovator  

Go Back   EcoRenovator > Improvements > Solar Power
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts Search Today's Posts Mark Forums Read


Reply
 
Thread Tools Display Modes
Old 10-25-18, 09:18 PM   #1
Kimi Xiong
Lurking Renovator
 
Join Date: Oct 2018
Location: China
Posts: 7
Thanks: 2
Thanked 0 Times in 0 Posts
Default solar PV panel:The Comparison between UAV Inspection and Manual Inspection

Hello everyone!

This is my first post, I am happy to share some solar-related information for you.

Photovoltaic inspections & maintenance mainly rely on workers to proceed infrared analysis and I-V curve testing on site. In this way, a comprehensive inspection of a 100 MW photovoltaic field will cost two workers /15- 30 days.Therefore, the huge consumption of labor and working hours has become a pain problem that has long hindered the effective operation and maintenance of photovoltaic fields.

Nowadays, relying on the big data analysis capabilities of the latest drone & robot technology and artificial intelligence, it is no longer a fantasy to complete the detection and analysis of a 100 MW photovoltaic power station just need three days with one worker.

Do you have any better views?

Kimi Xiong is offline   Reply With Quote
Reply


Tags
#solar pv #solar energy

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:58 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design