OK here are my final 2 drawings. The only difference between them is how to connect to the hotwater tank. In the first the tank has 2 ports specifically for this purpose so hook up is trivial. In the second it's identical to a regular hotwater tank so you have to put cold in to the drain and loop it back through into the cold to get your circulating loop. The thermal expansion tank is required by code apparently and is on his check list. Why a regular water heating system doesn't require it but this one does I don't know and don't care anymore. It's cheaper to just add one and make him happy then the time is worth fighting over it.

I still haven't heard if anyone can actually find the first tank in Canada that's why I've got the second one.

Tank is hopefully a Rheem Marathon CMTS85345


Tank is a Rheem Marathon MR75245


At this point my only concern is on the inspectors check list it states "System parts to be Certified and Approved (BCBC 7.2) "

If this means the potable parts then I'm golden. If he is going to insist on the solar collectors being certified then the project goes without permit. There is zero money savings if I have to buy the panels.

strider3700 is offline   Reply With Quote
Old 02-02-11, 02:09 PM   #22
strider3700
Master EcoRenovator
 
Join Date: Dec 2008
Location: Vancouver Island BC
Posts: 745
Thanks: 23
Thanked 37 Times in 30 Posts
Default

Trip #3 to the library to read the building codes tells me that since I don't have backflow preventer's I interpret it as meaning I don't need the pressure tank. If he says I do anyways I'll do it. Not worth arguing over.

For the collectors bcbc 7.2 states that everything in the domestic side has to meet plumbing requirements. pipe, fixtures,... at the very end it says solar has to meet 379.1 which is the section on the heat exchanger. The heat exchanger will meet that requirement. I suppose I'll find out this afternoon.

For anyone counting this has been 3 weeks and 7 different drawings with dozens of hours of research to get the permit for this. I could be done the install by now instead I haven't bought 1/2 the parts...
strider3700 is offline   Reply With Quote
Old 02-02-11, 04:20 PM   #23
strider3700
Master EcoRenovator
 
Join Date: Dec 2008
Location: Vancouver Island BC
Posts: 745
Thanks: 23
Thanked 37 Times in 30 Posts
Default

Pricing has returned. The GEA dw4-6 would be $600-$700 and I would have to wait at least 3-4 months so the duda diesel model it is.

No word on availability on the marathon cmts85345 and it appears that noone actually has it anywhere. Most have never heard of it. So the inspector will be getting the drain to cold circulation loop drawing.
strider3700 is offline   Reply With Quote
Old 02-02-11, 06:53 PM   #24
strider3700
Master EcoRenovator
 
Join Date: Dec 2008
Location: Vancouver Island BC
Posts: 745
Thanks: 23
Thanked 37 Times in 30 Posts
Default

Spoke with the inspector. Everything is fine and I can get the permit based on the drawings. He will however fail it if I don't buy an approved commercial collector and just use that. His reasoning is it's in the rules. We both agreed it's just a cash grab by the solar industry in Canada that made the rules the way they are and he pointed out that now that the government rebates are gone the industry has died because the systems are too expensive but nothing I can do about it.

So I'm going to figure out what it takes to meet CSA approval for the panels. I'm also going to figure out what it takes to get that sticker and if it's worth doing. I know that I read that Kit panels are available to save on shipping so maybe an approved kit already exists that is cheap. If not maybe one will soon. I'll also be speaking with the politicians that will listen to get these rules changed. This is bull****.

Nothing says I won't have panels in my backyard soon anyways. Until someone complains noone can say a thing about it
strider3700 is offline   Reply With Quote
Old 02-02-11, 08:56 PM   #25
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

With all the hassle its been its no wonder anyone even interested in solar wouldn't be turned off from doing it.
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote
Old 02-03-11, 01:10 AM   #26
strider3700
Master EcoRenovator
 
Join Date: Dec 2008
Location: Vancouver Island BC
Posts: 745
Thanks: 23
Thanked 37 Times in 30 Posts
Default

There is a way to do it hassle free. Call a local certified installed and give him a check for roughly $10,000. A few weeks to a month later you have a working system. at my current usage 25 years from now the system will have paid for itself assuming nothing failed out of warranty and the guy was around to fix what ever did go wrong during that time.
strider3700 is offline   Reply With Quote
Old 02-03-11, 06:11 AM   #27
Piwoslaw
Super Moderator
 
Piwoslaw's Avatar
 
Join Date: May 2009
Location: Warsaw, Poland
Posts: 960
Thanks: 188
Thanked 110 Times in 86 Posts
Default

Strider, I'm impressed at how you're plowing through all this red tape. I hope that all the time you've put into this will pay off. Good luck!

Quote:
Originally Posted by strider3700 View Post
Spoke with the inspector. Everything is fine and I can get the permit based on the drawings. He will however fail it if I don't buy an approved commercial collector and just use that.
Would it be possible to get one small commercial collector (the cheapest possible) to get the system certified and OK'ed, then add your own solar panels when the dust has settled?
__________________
Ecorenovation - the bottomless piggy bank that tries to tame the energy hog.
Piwoslaw is offline   Reply With Quote
Old 02-03-11, 10:21 AM   #28
strider3700
Master EcoRenovator
 
Join Date: Dec 2008
Location: Vancouver Island BC
Posts: 745
Thanks: 23
Thanked 37 Times in 30 Posts
Default

I've heard that this approach has been taken before And I may go with it as well. We'll see. The cheapest I can find so far is $400 and it's on the wrong corner of the continent so shipping will hurt.
strider3700 is offline   Reply With Quote
Old 02-03-11, 11:17 AM   #29
AC_Hacker
Supreme EcoRenovator
 
AC_Hacker's Avatar
 
Join Date: Mar 2009
Location: Portland, OR
Posts: 4,004
Thanks: 303
Thanked 723 Times in 534 Posts
Default

Quote:
Originally Posted by strider3700 View Post
OK here are my final 2 drawings...
Strider,

Another way I have seen this done is by using two circ pumps in series for lifting the water from the tank after draindown.


The idea is that the pumping power required to initially fill the collectors and get the circuit going is greater than the pumping power required to maintain circulation. A timer is used to kick-in the second pump as the first pump comes on so that they are pumping together in series... then when the time period elapses, the power is cut to the second pump and first pump alone maintains full circulation.

They tell me that the head loss from pumping through a non-powered pump is pretty small.

-AC_Hacker
Attached Thumbnails
Click image for larger version

Name:	2-pumps.jpg
Views:	1489
Size:	13.4 KB
ID:	1264  
__________________
I'm not an HVAC technician. In fact, I'm barely even a hacker...
AC_Hacker is offline   Reply With Quote
Old 02-03-11, 02:49 PM   #30
menaus2
Apprentice EcoRenovator
 
Join Date: Feb 2011
Location: Driftless Region, North America, Earth, Solar System, Orion Arm, Milky Way Galaxy,Virgo Supercluster
Posts: 116
Thanks: 13
Thanked 34 Times in 25 Posts
Default

Man that is some insane code up there! Keep fighting the good fight.

menaus2 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 08:10 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design