EcoRenovator  

Go Back   EcoRenovator > Improvements > Geothermal & Heat Pumps
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts Search Today's Posts Mark Forums Read


Reply
 
Thread Tools Display Modes
Old 01-22-23, 02:44 PM   #1
skyking
Helper EcoRenovator
 
Join Date: May 2011
Location: Western Washington
Posts: 89
Thanks: 46
Thanked 20 Times in 13 Posts
Default New home build with two GSHPs

hello all. It has been a while. We are in the planning stages of our new home build now.
You may recall I helped my brother with his system.
https://ecorenovator.org/forum/showthread.php?t=1575

The new house is 2 stories over an unfinished ICF basement. It will have a dedicated equipment room in the basement for all my fiddly infrastructure pleasure.
The proposed plan is 6 tons of loops in a 4 or 6 pass trench layout, manifolded in the basement.
Primary heating will be a 3 ton hydronic unit.
the second unit is a 3 ton HVAC for supplemental heat and summer cooling.

The house has 1700 SF down and 1000 SF up, and about 2200 SF of hydronic heated floor area.
The basement will not get floor heating, due to the unfinished nature of it. I will give it air heating as needed to keep it a conditioned space, but being ICF it will be fully insulated from the start.
I will rough in some plumbing down there. It would not do to put a bunch of loops in the slab, only to have to cut them when cutting in plumbing in the future or for future owners, so the heated slab is not a happening thing.

skyking is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:37 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design