EcoRenovator  

Go Back   EcoRenovator > Improvements > Geothermal & Heat Pumps
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-05-15, 08:27 AM   #11
MN Renovator
Less usage=Cheaper bills
 
MN Renovator's Avatar
 
Join Date: Nov 2010
Location: Minneapolis, MN
Posts: 939
Thanks: 41
Thanked 116 Times in 90 Posts
Default

Quote:
Originally Posted by theoldwizard1 View Post
If I ever had a GSHP system installed, there would be a "performance" clause in the contract. If my inlet water temp EVER fell below 40F, the installer would have to repair/replace/agument the ground loop. I would try to hold 50% of his installation fee in escrow for at least 1 year.

If you are going to pay the premium of having a GSHP, you want one that is designed and installed for optimal performance !
Do you think there would ever be a contractor willing to provide such a performance clause? ..or allow themselves not to be paid in full for that long? Most contractors can't afford to provide such a guarantee unless their business was more of a sure thing or health related like radon mitigation.

MN Renovator is offline   Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 08:55 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design