Old 11-05-12, 12:40 PM   #111
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

The plumbing update is done. I replaced about 20ft of 3/4" copper with 1/2" pex. I timed things before and after. It used to take 50-55 seconds to get hot water upstairs. Now it takes 20-25s. So, it has been more than halfed. This makes sense because 1/2" PEX has under half the capacity as 3/4" copper pipe. In a 20ft length we're looking at .45 gallons for 3/4" vs .18 gallons for the 1/2" PEX.

Another side benefit is that I can now set my water heater to a lower temperature because the PEX (which I did insulate) is loosng less heat than the copper did. It used to be set to 140F, and now it is set at 130F. It is an on demand electric water heater and has a regulated output temperature.

I know 130F still sounds high, but I also found out this weekend while doing the plumbing that my shower head mixes in quite a bit of cold water on 'full hot'. So, I'll be looking into fixing that as well. Then I should be able to turn it down further.

Pictures to come soon.

__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote
Old 11-06-12, 08:06 AM   #112
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

Here are the pictures.

This is the connection downstairs. I threw in a ball valve so we could use hot water as I finished up the rest of the install which took two days total.

I didn't get any shots of everything totally finished, but it is all insulated except for the bit in the wall. I didn't cut the wall open, so I just insulated everything else that I could.







This is the setup on the opposite end. I had to cut the ceiling back a bit and cut a hole under the vertical plumbing run to the shower. The pex comes up from the basement through the wall just beyond the coiled up pex.








This is the first tee for the sink line.







And here we have the connection for the shower.






I ran the pex as far as I could. The sink line I was able to bring all the way. The shower I was only able to bring it as far as the floor.

Attached Thumbnails
Click image for larger version

Name:	house 002.JPG
Views:	1641
Size:	51.1 KB
ID:	2662   Click image for larger version

Name:	house 021.JPG
Views:	1715
Size:	53.0 KB
ID:	2663   Click image for larger version

Name:	house 025.JPG
Views:	1638
Size:	59.7 KB
ID:	2664   Click image for larger version

Name:	house 027.JPG
Views:	1640
Size:	50.7 KB
ID:	2665   Click image for larger version

Name:	house 031.JPG
Views:	1385
Size:	48.7 KB
ID:	2666  

Click image for larger version

Name:	house 036.JPG
Views:	1546
Size:	36.6 KB
ID:	2667   Click image for larger version

Name:	house 038.JPG
Views:	1464
Size:	52.5 KB
ID:	2668   Click image for larger version

Name:	house 034.JPG
Views:	2480
Size:	34.4 KB
ID:	2669  
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote
Old 11-07-12, 07:28 AM   #113
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

Well its been a busy few days. I got the insulation mesh hung Monday night and Tuesday morning. Tuesday afternoon the insulation guy came out and dense packed the wall. Everything went very smoothly and he was impressed and liked blowing with the mesh on the wall.

The wall for the most part feels fairly firm. There is some differences in density. But, almost everything seems mattress hard like S-F suggested it should be.

Pictures:

This is the stapling around the windows. Yay for a million staples. There was absolutely no issues with any staples pulling up. The stapling method S-F suggested worked great. I have an Arrow electric stapler and used T20 staples spaced about 1.5 - 2" apart. I think I used almost a full four boxes of staples on the wall. In retrospect I think 2-2.5" spacing would probably be fine if not a little more.






This is the finished meshed wall.




And of course the finished insulated wall.




Phew, I'm glad that is done. Now I can finish the rest of the room at a more leisurely pace.
Attached Thumbnails
Click image for larger version

Name:	house 003.JPG
Views:	1478
Size:	60.9 KB
ID:	2670   Click image for larger version

Name:	house 007.JPG
Views:	2038
Size:	50.4 KB
ID:	2671   Click image for larger version

Name:	house 013.JPG
Views:	1594
Size:	43.2 KB
ID:	2672   Click image for larger version

Name:	house 015.JPG
Views:	1702
Size:	49.8 KB
ID:	2673  
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by Daox; 11-07-12 at 07:32 AM..
Daox is offline   Reply With Quote
The Following User Says Thank You to Daox For This Useful Post:
Exeric (11-08-12)
Old 11-08-12, 05:23 PM   #114
SimpleManLance
Helper EcoRenovator
 
Join Date: Jan 2011
Location: South-East MI
Posts: 58
Thanks: 1
Thanked 6 Times in 4 Posts
Default

looks good!! I want to do a full gut on the next house to insulate like this.
__________________
Jack of all trades, master of none.
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
SimpleManLance is offline   Reply With Quote
Old 11-08-12, 08:04 PM   #115
Exeric
Apprentice EcoRenovator
 
Join Date: Aug 2012
Location: California
Posts: 274
Thanks: 19
Thanked 37 Times in 28 Posts
Default

Yeah, very good job. I decided I also want to insulate the way you are doing it. I was going go with foam board on the inside but this looks cheaper, more effective, and easier. The only drawback I can see would be some bridging at the sill and top plate. Maybe not enough of a problem to worry about.
Exeric is offline   Reply With Quote
Old 11-09-12, 07:11 AM   #116
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

Yeah, its hard to eliminate all thermal bridging unless you're doing new construction. Passive house construction does focus on eliminating thermal bridging.
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote
Old 11-09-12, 06:43 PM   #117
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

Today was electrical work day. The father in law arrived (electrician) and we went to work. I hadn't even thought about it, but he recommended adding some can lights in the room and we went ahead with it and I think it looks pretty good.

Attached Thumbnails
Click image for larger version

Name:	house 006.JPG
Views:	1521
Size:	49.8 KB
ID:	2676  
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote
Old 11-10-12, 06:04 AM   #118
hamsterpower
Apprentice EcoRenovator
 
Join Date: Oct 2009
Posts: 142
Thanks: 0
Thanked 11 Times in 11 Posts
Default

that appears to be a junction box in the middle of the room. I hope you don't intent to hide that behind sheetrock.
hamsterpower is offline   Reply With Quote
Old 11-10-12, 07:29 AM   #119
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

Nope, but that is how it was. It has since been replaced by a fan box.
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote
Old 11-10-12, 01:04 PM   #120
Exeric
Apprentice EcoRenovator
 
Join Date: Aug 2012
Location: California
Posts: 274
Thanks: 19
Thanked 37 Times in 28 Posts
Default

Your lowered ceiling construction looks similar to what I had to deal with on my old house. On my house all my ceilings have sagged and cracked the old plaster. It turned out to be caused by two problems. The strongbacks that were there were 2x6s and were too wimpy to support the 2x4 ceiling joists. The other problem is that the connections between the joists and the strongbacks were just nails. Over time gravity just pulled the nails loose. Gravity works slowly but it is very persistent.

Assuming you are using Sheetrock and not plastering I wouldn't feel safe from a sagging ceiling with anything less than a 2x6, preferably 2x8 if the joists are 2x4. I can't really tell from your photo what your strongback or joist dimensions are or if it's safely tied to stronger structure above but just thought I'd mention it. Also, I hope you used either screws or small hurricane clips to tie the joists to the strongback.


Last edited by Exeric; 11-10-12 at 01:08 PM..
Exeric is offline   Reply With Quote
Reply


Tags
bamboo, diy, flooring, hydronic, remodel, superinsulate

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:33 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design