![]() |
![]() |
#291 | |
Supreme EcoRenovator
Join Date: Mar 2009
Location: Portland, OR
Posts: 4,004
Thanks: 303
Thanked 724 Times in 534 Posts
|
![]() Quote:
-AC_Hacker |
|
![]() |
![]() |
![]() |
#292 |
Apprentice EcoRenovator
Join Date: Aug 2010
Location: Windsor ON Canada
Posts: 229
Thanks: 4
Thanked 30 Times in 22 Posts
|
![]() For DIY you are looking for something simple easy to do and inexpensive. Otherwise you hire the contractor, go to work and work 2-3 years to pay what he has done in 2-3 days
![]() 1 use 1x2 lumber (cheapest) 2 time saving (you cut 1x2 approximately, I can only imagine how much time it will take to cut all rounds and how much waist is left ![]() 3 tubes do not contact subfloor(the bottom) they are suspended in omega shape heat transfer plates, because 1x2 is 3/4 inch high but 1/2tube OD is 5/8 of an inch. Tubes and transfer plates contact the top layer of black painted plywood. Wood strips do contact the subfloor, but you have no choice. Ideally you want all heat to go up, heat that goes down is waist because it will heat up the structure, the sealing of the lower floor(if you have one) etc. As everybody knows the heat transfer rate depends on area. In my case the contact area part is only fraction of the whole area of the floor because it is only sum of areas of all 1x2. 4 the heat from tubes and plates (which are the hottest part) is reflected by foil toward upper layer of floor making system more efficient. 5 Tubes expend and contract. In my case they are free at the end and can do it. Last edited by Vlad; 09-17-10 at 12:46 PM.. |
![]() |
![]() |
![]() |
#293 |
Apprentice EcoRenovator
Join Date: Aug 2010
Location: Windsor ON Canada
Posts: 229
Thanks: 4
Thanked 30 Times in 22 Posts
|
![]() I used 1/2 oxybarier pex (the orange one). My runs are in 200-250 feet range. I have 10 zones and will buy 10 zone manifold. I did not finish connecting everything together. I did not buy pumps yet. I am too busy with my rig and other things outside of the house. Ideally I need to finish everything outside before rain starts. A/C Hacker thanks for the manual. Looks impressive.
The other part of heating is ventilation which people usually ignore. With hydronic system you have to set ventilation system. I am going to use HRV unit and I have large coil from walk-in cooler which will be used for circulating cold water(coolant) for cooling supply air in summer. |
![]() |
![]() |
![]() |
#294 |
Apprentice EcoRenovator
Join Date: Aug 2010
Location: Windsor ON Canada
Posts: 229
Thanks: 4
Thanked 30 Times in 22 Posts
|
![]() Xringer, I might explained wrong about thermal mass. In my case I do not need it. Light (compare to 20 ton of concrete) system will allow to use set back. I will experiment it, it might be not practical to use. I built the whole house from scratch. I am not a builder and had to experiment a lot
![]() ![]() ![]() |
![]() |
![]() |
![]() |
#295 |
Apprentice EcoRenovator
Join Date: Aug 2010
Location: Windsor ON Canada
Posts: 229
Thanks: 4
Thanked 30 Times in 22 Posts
|
![]() Heat transfer plates is cheaper and easier to buy then build. You need omega shape. I bought few u-shape to try. U-shape will not hold the tubes you will need to hold tubes in place before cover them. In some places even with omega shape plates I had to use zep-straps to hold tubes down what a hassle.
|
![]() |
![]() |
![]() |
#296 | |
Lex Parsimoniae
Join Date: Feb 2009
Location: Woburn, MA
Posts: 4,918
Thanks: 115
Thanked 250 Times in 230 Posts
|
![]() Quote:
![]() If it was thick enough, it might add to the solidity of the floor, give the top sheet some support.?. The only thing that would cost less is clean river gravel..?. |
|
![]() |
![]() |
![]() |
#297 |
Apprentice EcoRenovator
Join Date: Aug 2010
Location: Windsor ON Canada
Posts: 229
Thanks: 4
Thanked 30 Times in 22 Posts
|
![]() The hardest part of all was attaching the top plywood to the subfloor. I marked everything before the top plywood was in place. You have to be extremely accurate and consistent with you marking. when top plywood in place you can not see tubes
![]() |
![]() |
![]() |
![]() |
#298 |
Lex Parsimoniae
Join Date: Feb 2009
Location: Woburn, MA
Posts: 4,918
Thanks: 115
Thanked 250 Times in 230 Posts
|
![]() You must have done a real good job with the screws, or you have super quality plywood on top. (or both).
I might have missed the details on the "omega shape plates". They look perfect for collector builders and maybe even to cool the backs of my PV panels.. Did you make them, or buy them pre-formed? |
![]() |
![]() |
![]() |
#299 |
Apprentice EcoRenovator
Join Date: Feb 2010
Location: Maryland
Posts: 120
Thanks: 26
Thanked 12 Times in 8 Posts
|
![]() Vlad - Nice drill rig! Are you going to use 2" well pipe for your drill stems?? 1 1/2 is a lot lighter!
|
![]() |
![]() |
![]() |
#300 | |
Apprentice EcoRenovator
Join Date: Aug 2010
Location: Windsor ON Canada
Posts: 229
Thanks: 4
Thanked 30 Times in 22 Posts
|
![]() Quote:
![]() ![]() Last edited by Vlad; 09-18-10 at 02:26 AM.. |
|
![]() |
![]() |
![]() |
Tags |
air conditioner, diy, gshp, heat pump, homemade |
|
|