EcoRenovator  

Go Back   EcoRenovator > Improvements > Solar Power
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


Reply
 
Thread Tools Display Modes
Old 10-09-18, 06:52 PM   #11
philb
Apprentice EcoRenovator
 
Join Date: Nov 2010
Location: Oklahoma City
Posts: 155
Thanks: 58
Thanked 17 Times in 14 Posts
Default

Oil Pan 4,
I didn't want a second meter or additional charges either, so I kept the grid and solar power completely separate with a Midnite Solar MNTRANSFER-60A 60 Amp 240 Volt Dual AC Manual Transfer Switch. $103. https://www.solar-electric.com/midni...xoC90sQAvD_BwE The switch works seamlessly without the TV or any appliance going down and back up. Now they can't say anything.

I do have a complete stand alone solar system with batteries. If battery power gets low, I switch the power to grid. That usually doesn't happen except during late nights in the summer.
That's an option you might have a look at.


Last edited by philb; 10-09-18 at 06:57 PM.. Reason: additional comments
philb is offline   Reply With Quote
Old 10-11-18, 09:56 PM   #12
oil pan 4
Land owner
 
Join Date: Nov 2012
Location: NM
Posts: 1,026
Thanks: 12
Thanked 127 Times in 107 Posts
Default

I went and talked to an engineer at the power coop.
So what they do is put a co-gen meter on your house to bill and back feed and put in a second meter that only tracks the panels power production.

So all the power comes and goes through your original service drop, all the power comes and goes through your original meter box, all the power the panels produce goes through the solar panels meter and back feeds to the breaker box.

I asked if I could do house panels then later on add satellite panes out in my field and connect those to their own meter, with both systems producing less than the 10kw limit.
They said it shouldn't be a problem.
oil pan 4 is offline   Reply With Quote
Old 12-04-18, 11:42 PM   #13
oil pan 4
Land owner
 
Join Date: Nov 2012
Location: NM
Posts: 1,026
Thanks: 12
Thanked 127 Times in 107 Posts
Default

The electrician looked over my work and they said it all looks very good.
Hopefully next Tuesday they will pull permits, put the meter base in and disconnects.
oil pan 4 is offline   Reply With Quote
Old 12-06-18, 07:35 PM   #14
where2
DIY Geek
 
Join Date: Apr 2013
Location: Sunny Florida
Posts: 401
Thanks: 74
Thanked 83 Times in 73 Posts
Default

Quote:
Originally Posted by oil pan 4 View Post
The electrician looked over my work and they said it all looks very good. Hopefully next Tuesday they will pull permits, put the meter base in and disconnects.
Great News!! I always love to hear positive updates on DIY PV arrays.

where2 is offline   Reply With Quote
Reply


Tags
diy, garage, heat pump, inverter, solar


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 10:16 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design