04-25-10, 06:47 AM | #11 |
Helper EcoRenovator
Join Date: Apr 2010
Location: Wellington, New Zealand
Posts: 61
Thanks: 0
Thanked 6 Times in 5 Posts
|
Right, lets see if I can post an image or two.
Here is a link to the first trial panel Added a simple reflector later to see what if any improvement, made approx 15% more hot water, esp in winter. Shows The six main roof mounted panels, small pv panels power the controllers, pumps etc. Wooden frames are screwed and glued, clamped to roof by galv steel straps that loop under tiles and screwed to rafters. Added a couple of attachments to the heat dump and a prototype grey water heat recovery device. Hopefully they will now post Cheers Mike |
|
|