EcoRenovator  

Go Back   EcoRenovator > Improvements > Appliances & Gadgets
Advanced Search
 


Blog 60+ Home Energy Saving Tips Recent Posts


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-16-22, 12:29 AM   #11
NiHaoMike
Supreme EcoRenovator
 
NiHaoMike's Avatar
 
Join Date: Oct 2008
Location: Austin, TX
Posts: 1,154
Thanks: 14
Thanked 257 Times in 241 Posts
Default

Quote:
Originally Posted by Elcam84 View Post
So you now have to come up with a monitoring system with a relay to shot off a load when the charger is running. Why overcomplicate it as well as not doing it according to code and common sense. Just run another 220 circuit from the panel. Most panels are in the garage already and a few feet of wire a breaker and a receptacle are less than $100 and you won't have any issues.
Two use cases I can think of are if there is no spare capacity left to add another breaker or if the panel is quite a distance from the garage but there's an existing circuit that could be tapped.

In the case of adding solar, the concern is that the load could potentially pull more than what the original breaker was sized to allow (since the solar is a second source), so add a second breaker at the load or junction point of the same rating as the original breaker and have the solar connect in between the two breakers.

__________________
To my surprise, shortly after Naomi Wu gave me a bit of fame for making good use of solar power, Allie Moore got really jealous of her...
NiHaoMike is offline   Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:47 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger
Inactive Reminders By Icora Web Design