12-26-15, 12:57 PM | #11 |
Super Moderator
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
|
It finally stopped raining. My oldest boy helped me mixed the cement today.
Each hole had two 2’ Tee post drove into the ground with 6” above the ground the 10’ Half inch rebar cut up in each hole. It was put down like a cross hatched pattern. That should make it very strong for the pallet racking. The weather is so nice today it is hot in the greenhouse.
__________________
Current project Aquaponics system , Passive Solar Greenhouse build To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Solar Install 12.5 Kwh- To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Mini Split installs - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. EV Chevy Volt - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
The Following User Says Thank You to pinballlooking For This Useful Post: | Daox (12-26-15) |
|
|