09-10-13, 11:20 AM | #1 |
Helper EcoRenovator
Join Date: Nov 2010
Location: Internet
Posts: 60
Thanks: 0
Thanked 2 Times in 2 Posts
|
Downsizing a Long Plumbing Run For Faster Hot Water
While I am remodeling my office, I decided to take the opportunity to access some plumbing in the wall and ceiling. I have a bathroom on my second floor, and it takes a long time to get hot water up there since the hot water heater is in the basement. The old setup was run […]
More... |
|
|