I took out the natural gas heater and AC coil. I had to take down a hard supply line to get it all out. I used PVC pipe and rolled it out of the crawl space by myself. that worked well.
That is how I will get that 360 pound Geo unit under there.
Natural gas line is caped off.
I have everything measured to put my order it for the return box and supply box. I ordered some anti vibration pads.
https://www.amazon.com/gp/product/B0...?ie=UTF8&psc=1
Here is a picture of my manifold.
__________________
Current project Aquaponics system , Passive Solar Greenhouse build
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Solar Install 12.5 Kwh- To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Mini Split installs - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
EV Chevy Volt - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Last edited by pinballlooking; 12-21-18 at 08:42 AM..
|