The thread has gotten a little diluted and terribly side tracked. Let’s get this back on track
I had posted some progress on “ticking all the boxes”

The project thus far has the pergola finished and producing power ( 4 kw ) The power was directed through a high voltage charge controller charging the old Nimh battery pack ( 390 volt ). 29 kWh

The old battery pack has been removed as it developed internal shorts (catastrophically)

A newer battery pack is being sourced

The last week or so has been busy to finish installing the remaining 7 Kw of solar panels on the roof. The Dynoraxx system was used. Very nice system.

My testing of a high voltage inverter solution was unsatisfactory therefore the development of a 2 phase high voltage inverter has begun

Randen