View Single Post
Old 12-27-18, 10:52 AM   #60
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

My system is a two-stage system. I connected up energy monitoring yesterday and determined that my second stage was kicking in before it gave the first stage a real chance.

I changed my thermostat to differential first stage 1 degree and second stage 2 degrees. Reading the manual, the second stage would not come on until 2 degrees from set point with these settings.

This is my first two stage system. How do others have this setup?

Does it sound like I am on the right track or is there a better way?
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by pinballlooking; 05-22-19 at 08:36 AM..
pinballlooking is offline   Reply With Quote