View Single Post
Old 12-27-18, 09:36 AM   #59
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

I have the energy monitor working correctly now. The TED 5000 can be a little finicky setting up something new.

But once you have it going it works pretty well.



Stage one is using 1.882 Kw stage two is about 2.8 Kw. I have it set as stand alone so it will give Geo total energy for the days, month and later on the year.

I do have net metering but that is why I setup the energy monitor so I can tell and share how much power just the geothermal takes to heat and cool with.

I do think we will run out of our banked power this year. I don’t think that will happen next year now that we are doing HVAC with geothermal.
That is just a prediction time will tell.
Attached Images
 
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
pinballlooking is offline   Reply With Quote