View Single Post
Old 12-26-18, 12:16 PM   #55
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

I went under the house and did some finishing touches. Here is what’s it all looks like.

I will walk you from the manifold to the plenum.

I cemented a 4x4 treated post into the ground so the pump noise would not go into my sons bedroom. It was loud in his room before I did this. Now you cant hear it at all. He thanked me for doing this.


Pipe insulated out of the manifold.


I used white flex straps so no noise would be transmitted into the house.




The new transition to the old duct work.


The Geothermal unit.


The New plenum.


The back side of the new plenum.


The drain line and the hot water buffer tank is all that is left under the house.


The rest of the work is getting the yard and horse pasture back into shape and this can take some time to do. It does not need done in a day.
Attached Images
        
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by pinballlooking; 01-06-21 at 08:26 PM..
pinballlooking is offline   Reply With Quote