View Single Post
Old 08-22-17, 09:25 PM   #23
ecomodded
Supreme EcoRenovator
 
Join Date: Sep 2012
Location: Vancouver Island,Canada.
Posts: 1,037
Thanks: 116
Thanked 100 Times in 87 Posts
Default

Since the last photo boxed in the header with 2x6s mounted the 3/4" plywood flush to the 2x6s and packed gaps around the beam with lumber.

Tomorrow plan is to remove the old wire and grey scratch coat and re paper with 30 weight then tyvek for stucco , wire in prep for ghe first scratch coat

Tomorrow will pick up a 10 ft casing bead and a 8 ft corner edge and drip edge

Its been hot 30 * the plan is to prep all day and scratch coat in the evening so I have time to work it and it can dry over night.

As Im new to stucco the prep will take me a day easy


Been watching Kirk's Giordano's plastering video's getting the jest of it he has videos for every stage.

Attached Images
  
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by ecomodded; 08-22-17 at 11:25 PM..
ecomodded is offline   Reply With Quote