Since the last photo boxed in the header with 2x6s mounted the 3/4" plywood flush to the 2x6s and packed gaps around the beam with lumber.
Tomorrow plan is to remove the old wire and grey scratch coat and re paper with 30 weight then tyvek for stucco , wire in prep for ghe first scratch coat
Tomorrow will pick up a 10 ft casing bead and a 8 ft corner edge and drip edge
Its been hot 30 * the plan is to prep all day and scratch coat in the evening so I have time to work it and it can dry over night.
As Im new to stucco the prep will take me a day easy
Been watching Kirk's Giordano's plastering video's getting the jest of it he has videos for every stage.