Maybe this is normal in the industrialized brewery but is seems pretty cool.
I do not keep up with how many business get LEED Platinum certification. Maybe it is common practice. I just read all the things they have been doing and thought it was great.
“the brewery uses Capstone Microturbine technology to convert methane biogas captured from their on-site wastewater treatment plant into electricity. Between the solar array and the microturbines, in Mills River Sierra Nevada produces an average of 1 megawatt of AC power on site,”
__________________
Current project Aquaponics system , Passive Solar Greenhouse build
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Solar Install 12.5 Kwh- To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Mini Split installs - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
EV Chevy Volt - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Last edited by pinballlooking; 06-16-16 at 11:02 AM..
|