View Single Post
Old 01-04-14, 05:04 PM   #106
Exeric
Apprentice EcoRenovator
 
Join Date: Aug 2012
Location: California
Posts: 274
Thanks: 19
Thanked 37 Times in 28 Posts
Default

Good point. If I had to dig the ground loop GSHP on a preexisting house as a retrofit in Mass I'd stick with Xringer's position. I'm 60 myself so I can identify with an ROI that may not be optimistic. I'm not the young buck AC is.
Exeric is offline   Reply With Quote