Now I'm talking about actually doing this the power coop wants me to install a second meter so they can install a seperate service for the solar power.
I installed 2 new sub panels to accommodate solar back feeding. I'm glad I didn't pay an electrician to do it.
But that means skys the limit for how much I can produce. I don't have to ever worry about main panel limits on back feeding
|