View Single Post
Old 09-24-13, 11:18 PM   #60
Xringer
Lex Parsimoniae
 
Xringer's Avatar
 
Join Date: Feb 2009
Location: Woburn, MA
Posts: 4,918
Thanks: 114
Thanked 250 Times in 230 Posts
Default

I've been working on an new way to control when the A7 (ASHP) runs.
It was on a timer that enabled 120AC to the A7 in the early afternoon.
In the hopes there was a lot of sunshine during the morning hours.
Now, I'm working on using a micro controller (CAI) to monitor
the water temperature, solar conditions etc, to optimize performance.

During the last 5 or 6 days, that I've been working on the CAI programing,
all my time has been spent on other stuff and the A7 has been unplugged..

Meaning, we've been using nothing but solar PV heated hot water!
It's not boiling hot, but it's doing the job, this week..
__________________
My hobby is installing & trying to repair mini-splits
EPA 608 Type 1 Technician Certification ~ 5 lbs or less..
Xringer is offline   Reply With Quote
The Following User Says Thank You to Xringer For This Useful Post:
TackyTeddy (09-27-13)