The secondary burn modification is complete and ready for a test fire. All of the parts used to make this modification are used pieces of metal repurposed from things like a old treadmill, and some old pipe. Of coarse the stove was built in 1985 too.

Below is the "L" with the air holes that the pipe goes into. Notice that the holes are staggered.


I found that my wood clamps help when drilling the holes in the pipe. It also made it much easier to use the center punch as well.



Everything is welded, the fire bricks are in and ready for the first new secondary burn modification fire.


Attached Images
   

Last edited by Geo NR Gee; 03-05-12 at 12:18 AM..