This is not ideal, but here is how I would do it. Remove carpet, baseboards and prepare to pour 3 inches of concrete on top of the slab. Pex secured to existing slab.

You need a minimum of 3 inches for a concrete pour to be firm and not to crack.

Now shave 3 inches off doors, etc . . .

Steve