View Single Post
Old 12-02-18, 04:53 AM   #24
randen
Uber EcoRenovator
 
Join Date: Apr 2011
Location: Strathroy Ontario Canada
Posts: 654
Thanks: 9
Thanked 182 Times in 127 Posts
Default

The excavators bucket was 4 ft wide so the pipe was laid two loops on the bottom of the trench. so the tube were 16" apart.

Randen
randen is offline   Reply With Quote