View Single Post
Old 11-21-18, 12:31 PM   #14
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

I checked a couple other places and they were all 8 weeks out to get a system that would not work with the current tax credits. They even called the factory they only had a left return no right return so they have to build it. They were all more money also.

I just put a deposit down on the system it was in stock.
3-ton Tranquility 30 system two stage with 4 600’ pipe and pump center.
I will pay for it the first week in December.

I did a test dig and this is not going to happen with my tractor.
It is a 6' max hoe but 5' took 25 min maybe 3' long.
I can use it to dig close to the house and to the fence that is about 25’.

It will do great to fill the trench back in and level it out but there is no way it is going to do the whole dig.

It is 600’ per ton but I am going to put in 4 600’ loops. That is 600 foot more loop than is required.

Now I will have to talk to my neighbor about renting his mini excavator.
I think he has a 2' bucket so I would need to 300' trenches.
I will cover it all back up with my tractor.


I am excited but it will be a big project.
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by pinballlooking; 11-22-18 at 10:50 AM..
pinballlooking is offline   Reply With Quote