View Single Post
Old 10-02-18, 10:03 PM   #7
oil pan 4
Land owner
 
Join Date: Nov 2012
Location: NM
Posts: 1,026
Thanks: 12
Thanked 127 Times in 107 Posts
Default

Now I'm talking about actually doing this the power coop wants me to install a second meter so they can install a seperate service for the solar power.
I installed 2 new sub panels to accommodate solar back feeding. I'm glad I didn't pay an electrician to do it.

But that means skys the limit for how much I can produce. I don't have to ever worry about main panel limits on back feeding
oil pan 4 is offline   Reply With Quote