Quote:
Originally Posted by bennelson View Post
I just checked my calendar, and it looks like the last time I had the holding tank emptied was two weeks before I started this project.

For two of the seven weeks that I have been filling my tank, that was NOT with the greywater toilet system.

That means my NEXT tank should be even BETTER than 50 days
Are you still on the same tank, or how long did it go before you had to have it pumped?

Good to see an update, I'd been wondering how things were going.