the insulating and construction has advanced where the storage walls and ceiling are to the painting stage, the exterior hatch has to have exterior waterproofing and interior insulation. The entry has been partially completed (with its construction of 1/2 plywood 2 inch styrofoam and R20 in framed wall cavity) and air conditioner platform is done. The air conditioner will exhaust its heat into the basement space to reduce alternate space heating.
circuit board will be removed completely and controller wires will be connected as per original schematic.
Still need to attach air exchanger louvers, lighting and control/sensor wiring.