Here is the (almost) finished greenhouse.
I still need to add some of the automation but it is now operational.



The roof is 10mm polycarbonate panel. The picture shows the blinds down, the two windows have double glazed glass panels behind. The orange colored panel is temporary while I wait for the glass to arrive.