Howdy guys I got a lot more done thanks to the help of a GOOD friend.

First I swagged the 3/8" lines, its SO much easier than 1/4"


Then I laid out the line, brazed it all up, pulled a vaccum for several hours, made sure I had NO leaks, then zip tied about 20 bricks to the end that is going in the water.



Then the digging started, I got down to 9 feet deep in some places, but never less than 6 feet. When we got close to the pond the machine tried to slip and almost went for a swim, so I will have to dig about a 4 foot spot by hand.




I insulated 2 feet down as it came into the green house.