View Single Post
Old 01-30-11, 03:18 AM   #36
strider3700
Master EcoRenovator
 
Join Date: Dec 2008
Location: Vancouver Island BC
Posts: 745
Thanks: 23
Thanked 37 Times in 30 Posts
Default

Jan 28 - easy day I bought supplies to build new shelves in the pantry and to trim out the windows in the basement.

Jan 29 - I gutted the old pantry shelves, cleaned it right out and then installed some new adjustable ones. It's just those clip in bracket things and plywood but it sure helped. I finished the evening getting my spreadsheet of ds18b20 sensors completely filled out and all of them logged. Next I wired up 2 more to get the kids rooms at least going. Lots of fighting there. Check the datalogger thread for details.
strider3700 is offline   Reply With Quote