With a good portion of the inside plumbing done, I've shifted to working on the collector frame. I was able to scramble & get all the materials before the Beer Virus cases started taking off so I guess I'll have extra time to work on it.

The frame is treated 2x6s wraped around 1/2" treated plywood sheets and secured with brackets. This way I can use full twinwall polycarbonate sheets for the glazing. It's a lot of work, but it will be well worth hauling less wood for years to come!







Attached Images
    
__________________
Resiliency is the new sustainability.

The Things to do are: the things that need doing, that you see need to be done, and that no one else seems to see need to be done. -Buckminster Fuller

Last edited by Daox; 04-05-20 at 11:32 AM..