View Single Post
Old 03-10-15, 01:13 PM   #1
osolemio
Hong Kong
 
Join Date: May 2010
Location: Hong Kong
Posts: 108
Thanks: 20
Thanked 17 Times in 13 Posts
Default Partly operational: Extensive solar thermal/electric hybrid system

My very extensive solar power project that I have been working on for about 5 years (on and off, as time and money permits), is now partly operational.

Temperatures here are in Centigrade:



As you can see, the annual geo solar heat storage, as well as the 3 x 375 USG buffer tanks are NOT yet online (gray lines). Even so, massive amounts of heat is captured and sent into the foundation of the house, as well as into the 375 USG main heat buffer.

I hope to have the system fully operational by this summer.

__________________
Space heating/cooling and water heating by solar, Annual Geo Solar, drainwater heat recovery, Solar PV (to grid), rainwater recovery and more ...
Installing all this in a house from 1980, Copenhagen, Denmark. Living in Hong Kong. Main goal: Developing "Diffuse Light Concentration" technology for solar thermal.