View Single Post
Old 07-04-16, 10:20 AM   #3
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

The boys and I installed the dock on Friday.
The old setup used 3/8 bolts in ½ holes this caused a lot of wear.
I used ½” bolts in ½” holes no play. This made the install harder but should make the parts last much longer.
I will need to wire the dock with conduit but for now we just used an ext. cord.



Attached Images
  
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
pinballlooking is offline   Reply With Quote