Project is still on slow-cook for a while..
MBATR, I've been thinking about a couple of items.
1. How am I going to lift a large 100+ pound tank up in the air and sit it down,
inside the aluminum drain pan, without crushing the sides of the ($20) pan??
Ropes and pulleys?
2. We had a discussion a while back, about No-waiting hot water. Instant warm water at the tap!
I'm wondering, if I skip using a heat trap on the output side of the tank..?
And allow a small amount of warmed water to fill up the pipe (insulated) going to the taps & outlets..
It seems like an easy way to get hot water faster, but also seems a bit wasteful.
But, I should be able to determine the cost of 'fast' hot water pretty easily.
If it's too high, (over 2kwh/day) I can add a heat trap to the PEX line.
Comments Please.