View Single Post
Old 05-07-12, 06:09 PM   #75
rhino 660
Apprentice EcoRenovator
 
Join Date: Oct 2010
Posts: 105
Thanks: 0
Thanked 10 Times in 8 Posts
Default

how do i calculate COP
__________________
2 ton geo unit 2400' HDPE slinkey
4KW solar with battery backup
$8.98 power bill
rhino 660 is offline   Reply With Quote