View Single Post
Old 09-19-13, 10:29 AM   #43
stevehull
Steve Hull
 
Join Date: Dec 2012
Location: hilly, tree covered Arcadia, OK USA
Posts: 826
Thanks: 241
Thanked 165 Times in 123 Posts
Default

Quote:
Originally Posted by Robaroni View Post
Steve,
Thanks for the info.
One thing, I know when I installed my intertie system that the electrical inspector was adamant about a shut off that is labeled and easily accessible from the ground, not on the roof and also adamant about metal conduit to the box from the modules.
Rob
Both superb ideas.

Steve
__________________
consulting on geothermal heating/cooling & rational energy use since 1990
stevehull is offline   Reply With Quote