View Single Post
Old 12-28-15, 10:26 AM   #502
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

I now have eight barrels full of water ready to become solar batteries. We just need some sun and less rain.
The first small front vent is 90% done. There are two four foot vents on the sides then three eight foot vents across the front they all take about the same amount of welding.





These are the POP Rivets I am using Stainless CLOSED/SEALED 4-4 1/8 x ¼
This is the first time I used a closed rivet. I like them. I bought these because water or wind will not go in the holes in the vent.

Attached Images
   
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by pinballlooking; 12-28-15 at 11:57 AM..
pinballlooking is offline   Reply With Quote