View Single Post
Old 12-26-15, 12:57 PM   #501
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

It finally stopped raining. My oldest boy helped me mixed the cement today.
Each hole had two 2’ Tee post drove into the ground with 6” above the ground the 10’ Half inch rebar cut up in each hole. It was put down like a cross hatched pattern. That should make it very strong for the pallet racking.

The weather is so nice today it is hot in the greenhouse.









Attached Images
    
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
pinballlooking is offline   Reply With Quote
The Following User Says Thank You to pinballlooking For This Useful Post:
Daox (12-26-15)