Thread
:
Remodeling the office (new floor, ceiling & adding insulation) passive house retrofit
View Single Post
08-27-11, 08:26 PM
#
35
Daox
Administrator
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
We started with the actual work today. We started by removing the old trim. Then we moved on to taking out the ceiling. It was quick and easy, just drywall.
Lastly, we pulled up the carpet which was quite a mess. The foam was fairly well stuck to the wood. I assume this is a factor of time and moisture. We scraped it as best we could but there is still a layer of foam here and there. I don't think it'll be a problem since we'll be putting everything over the top of it and it doesn't stick up much at all.
Attached Images
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox
View Public Profile
Send a private message to Daox
Find More Posts by Daox